Bridge protection at the Fechinger Valley Bridge (A6)

Since 2016, a traffic-line bridge protection system has been protecting the A6 motorway structure from overloaded trucks at the Fechinger Valley Bridge near Saarbrücken – on all four lanes.

The task

There are restrictions for heavy-duty vehicles on the Fechinger Talbrücke. To ensure compliance with these restrictions, a control system must operate around the clock – without personnel on site and without stopping the other traffic.

The solution of traffic-lines

The following was installed: 4 lanes of Weigh in Motion.

  • Weigh in Motion weighs each vehicle at full speed and determines the axle loads.

More about the system: Bridge protection and Vehicle differentiation (FDS).

Photos of the project

Project data at a glance

  • Building: Fechingen Viaduct
  • Street: A6
  • Location: Saarbrücken
  • Period: 2016
  • Performance: Bridge protection
  • Systems: 4 lanes Weigh in Motion

You can find an overview of all projects in our References.

Are you planning a bridge protection or axle load measurement?

We advise you from the feasibility study to planning and commissioning. Whether buying or renting – contact us.