Bridge protection at the Fechinger Valley Bridge (A6)
Since 2016, a traffic-line bridge protection system has been protecting the A6 motorway structure from overloaded trucks at the Fechinger Valley Bridge near Saarbrücken – on all four lanes.
The task
There are restrictions for heavy-duty vehicles on the Fechinger Talbrücke. To ensure compliance with these restrictions, a control system must operate around the clock – without personnel on site and without stopping the other traffic.
The solution of traffic-lines
The following was installed: 4 lanes of Weigh in Motion.
- Weigh in Motion weighs each vehicle at full speed and determines the axle loads.
More about the system: Bridge protection and Vehicle differentiation (FDS).
Project data at a glance
- Building: Fechingen Viaduct
- Street: A6
- Location: Saarbrücken
- Period: 2016
- Performance: Bridge protection
- Systems: 4 lanes Weigh in Motion
You can find an overview of all projects in our References.
Are you planning a bridge protection or axle load measurement?
We advise you from the feasibility study to planning and commissioning. Whether buying or renting – contact us.

