Bridge protection on the Bergshäuser Bridge (A44)
At the Bergshäuser Bridge on the A44 near Kassel, traffic lines implemented a bridge protection system using Weigh in Motion, a barrier system, and foundationless traffic sign bridges in 2018 and 2019.
The task
There are restrictions for heavy-duty vehicles on the Bergshäuser Bridge. To ensure compliance with these restrictions, a system of monitoring is needed that operates around the clock – without personnel on site and without stopping the rest of the traffic.
The solution of traffic-lines
Installed: 2 lanes of Weigh in Motion, barrier system, and foundationless traffic sign bridges.
- Weigh in Motion weighs each vehicle at full speed and determines the axle loads.
- An automated barrier system directs vehicles over the limit value before the structure is built.
- Unfounded traffic sign bridges carry signage and signals above the roadway.
More about the system: Bridge protection and Vehicle differentiation (FDS).
Project data at a glance
- Building: Bergshausen Bridge
- Street: A44
- Location: Kassel
- Period: 2018–2019
- Performance: Bridge protection
- Systems: 2 lanes with Weigh in Motion, barrier system, foundation-free sign gantries
You can find an overview of all projects in our References.
Are you planning a bridge protection or axle load measurement?
We advise you from the feasibility study to planning and commissioning. Whether buying or renting – contact us.

