Bridge protection on the Bergshäuser Bridge (A44)

At the Bergshäuser Bridge on the A44 near Kassel, traffic lines implemented a bridge protection system using Weigh in Motion, a barrier system, and foundationless traffic sign bridges in 2018 and 2019.

The task

There are restrictions for heavy-duty vehicles on the Bergshäuser Bridge. To ensure compliance with these restrictions, a system of monitoring is needed that operates around the clock – without personnel on site and without stopping the rest of the traffic.

The solution of traffic-lines

Installed: 2 lanes of Weigh in Motion, barrier system, and foundationless traffic sign bridges.

  • Weigh in Motion weighs each vehicle at full speed and determines the axle loads.
  • An automated barrier system directs vehicles over the limit value before the structure is built.
  • Unfounded traffic sign bridges carry signage and signals above the roadway.

More about the system: Bridge protection and Vehicle differentiation (FDS).

Photos of the project

Project data at a glance

  • Building: Bergshausen Bridge
  • Street: A44
  • Location: Kassel
  • Period: 2018–2019
  • Performance: Bridge protection
  • Systems: 2 lanes with Weigh in Motion, barrier system, foundation-free sign gantries

You can find an overview of all projects in our References.

Are you planning a bridge protection or axle load measurement?

We advise you from the feasibility study to planning and commissioning. Whether buying or renting – contact us.