Height control at the Sechshelden valley bridge (B277)

At the Sechshelden valley bridge on the B277 near Haiger, traffic lines implemented a height control using Height in Motion in 2024 and 2025. Vehicles that are too high are automatically diverted.

The task

Vehicles that are too high can damage a structure, for example by striking the structure with a raised platform. Therefore, every vehicle that is too high should be detected at the Sechshelden valley bridge before it causes damage.

The solution of traffic-lines

Height in Motion was used with automatic derivation.

  • Height in Motion measures the height of each vehicle and automatically detects vehicles that are too high.

More about the system: Height in Motion.

Photos of the project

Project data at a glance

  • Building: Sechshelden Viaduct
  • Street: B277
  • Location: Haiger
  • Period: 2024–2025
  • Performance: Height control
  • Systems: Height in Motion with automated diversion

You can find an overview of all projects in our References.

Are you planning a bridge protection or axle load measurement?

We advise you from the feasibility study to planning and commissioning. Whether buying or renting – contact us.