From the tender to operation: this is how a bridge protection project works
A bridge protection system must be effective quickly, because the bridge is usually already limited in capacity. Therefore, traffic-lines accompanies projects from a single source – from the initial assessment to ongoing operation.
The steps in summary
- Feasibility study: We examine the building structure, traffic conditions, and space requirements, and determine which modules are necessary.
- Planning: The measuring station, discharge, barriers and signage are adjusted to the location of the installation.
- Tender and award: We support with the technical details of the system.
- Installation: The installation usually takes about 30 days.
- Commissioning: The system is being tested and will go into autonomous operation.
- Operation: The system operates around the clock; the measurement data is available for analysis.
Buy or rent
Depending on the scope and budget of the project, the systems can be purchased or rented. Especially for bridges that are to be replaced within a foreseeable future, renting is often the more economical solution.
Experience from 16 bridge projects
Since 2013, traffic-lines has implemented bridge protection, axle load measurements, and height controls on 16 bridges, including the Leverkusener Rheinbrücke (A1) and the Rheinbrücke Neuenkamp (A40). You can find all projects in our brochure. References.
Are you planning a bridge protection or axle load measurement?
We advise you from the feasibility study to planning and commissioning. Whether buying or renting – contact us.