Fleher Bridge (A46, Düsseldorf): axle load measurement

At the Fleher Bridge on the A46 in Düsseldorf, traffic lines operated an axle load measurement station from 2020 to 2023. It recorded the actual loads of heavy traffic on the Rhine bridge.
Bergshäuser Bridge (A44, Kassel): Bridge protection

At the Bergshäuser Bridge on the A44 near Kassel, traffic lines implemented a bridge protection system using Weigh in Motion, a barrier system, and foundationless traffic sign bridges in 2018 and 2019.
Rheinbrücke Neuenkamp (A40, Duisburg): Bridge protection

At the Rheinbrücke Neuenkamp on the A40 in Duisburg, traffic lanes protected both directions: from 2018 to 2023 in the direction of Essen and from 2019 to 2024 in the direction of Venlo. Here, almost all modules of the system were used together.
Leverkusen Rhine Bridge (A1, Leverkusen): Bridge protection

The Leverkusen Rhine Bridge on the A1 is one of Germany’s most famous bridges. From 2017 to 2024, traffic lines have operated bridge protection with Weigh in Motion on eight lanes – the company’s largest project to date.
Fechinger Talbrücke (A6, Saarbrücken): Bridge protection

Since 2016, a traffic-line bridge protection system has been protecting the A6 motorway structure from overloaded trucks at the Fechinger Valley Bridge near Saarbrücken – on all four lanes.
Schiersteiner Bridge (A643, Mainz/Wiesbaden): Bridge protection

At the Schierstein Bridge between Mainz and Wiesbaden, traffic lines implemented its first bridge protection project in 2013. The Rhine bridge on the A643 was thus the starting point for all further installations.