Bridge protection at the Emschertal Bridge (A43)

Since 2024, an automated barrier system from traffic-lines has been ensuring protection of the structure at the Emschertal Bridge on the A43 in Herne.

The task

There are restrictions for heavy-duty vehicles on the Emschertal Bridge. To ensure compliance with these restrictions, a control system is needed that operates around the clock – without personnel on site or the need to stop the rest of the traffic.

The solution of traffic-lines

Automated barrier system was used.

  • An automated barrier system directs vehicles over the limit value before the structure is built.

More about the system: Bridge protection and Vehicle differentiation (FDS).

Photos of the project

Project data at a glance

  • Building: Emscher Valley Bridge
  • Street: A43
  • Location: Herne
  • Period: since 2024
  • Performance: Bridge protection
  • Systems: Automated barrier system

You can find an overview of all projects in our References.

Are you planning a bridge protection or axle load measurement?

We advise you from the feasibility study to planning and commissioning. Whether buying or renting – contact us.