Bridge protection at the Rhein-Herne Canal Bridge (A42)
Since 2024, traffic-line protection has been in use on the Rhein-Herne Canal Bridge on the A42 in Bottrop. Particularly noteworthy are traffic sign bridges with a span of up to 30 meters.
The task
There are restrictions for heavy-duty vehicles on the Rhein-Herne Canal Bridge. To ensure compliance with these restrictions, a system of control is needed that operates around the clock – without personnel on site and without stopping the other traffic.
The solution of traffic-lines
Installed: 4 lanes of Weigh in Motion, barrier system, traffic sign bridges up to 30 m in span.
- Weigh in Motion weighs each vehicle at full speed and determines the axle loads.
- An automated barrier system directs vehicles over the limit value before the structure is built.
- Traffic sign bridges with a span of up to 30 meters carry signs and signals above the roadway.
More about the system: Bridge protection and Vehicle differentiation (FDS).
Project data at a glance
- Building: Rhine-Herne Canal Bridge
- Street: A42
- Location: Bottrop
- Period: since 2024
- Performance: Bridge protection
- Systems: 4 lanes with Weigh in Motion, barrier system, sign gantries with spans of up to 30 m
You can find an overview of all projects in our References.
Are you planning a bridge protection or axle load measurement?
We advise you from the feasibility study to planning and commissioning. Whether buying or renting – contact us.

