Bridge protection at the Rhein-Herne Canal Bridge (A42)

Since 2024, traffic-line protection has been in use on the Rhein-Herne Canal Bridge on the A42 in Bottrop. Particularly noteworthy are traffic sign bridges with a span of up to 30 meters.

The task

There are restrictions for heavy-duty vehicles on the Rhein-Herne Canal Bridge. To ensure compliance with these restrictions, a system of control is needed that operates around the clock – without personnel on site and without stopping the other traffic.

The solution of traffic-lines

Installed: 4 lanes of Weigh in Motion, barrier system, traffic sign bridges up to 30 m in span.

  • Weigh in Motion weighs each vehicle at full speed and determines the axle loads.
  • An automated barrier system directs vehicles over the limit value before the structure is built.
  • Traffic sign bridges with a span of up to 30 meters carry signs and signals above the roadway.

More about the system: Bridge protection and Vehicle differentiation (FDS).

Photos of the project

Project data at a glance

  • Building: Rhine-Herne Canal Bridge
  • Street: A42
  • Location: Bottrop
  • Period: since 2024
  • Performance: Bridge protection
  • Systems: 4 lanes with Weigh in Motion, barrier system, sign gantries with spans of up to 30 m

You can find an overview of all projects in our References.

Are you planning a bridge protection or axle load measurement?

We advise you from the feasibility study to planning and commissioning. Whether buying or renting – contact us.