Bridge protection at the Schierstein Bridge (A643)

At the Schierstein Bridge between Mainz and Wiesbaden, traffic lines implemented its first bridge protection project in 2013. The Rhine bridge on the A643 was thus the starting point for all further installations.

The task

There are restrictions for heavy traffic on the Schierstein Bridge. To ensure compliance with these restrictions, there needs to be a control system that operates around the clock – without personnel on site and without stopping the rest of the traffic.

The solution of traffic-lines

The following was installed: 4 lanes of Weigh in Motion.

  • Weigh in Motion weighs each vehicle at full speed and determines the axle loads.

More about the system: Bridge protection and Vehicle differentiation (FDS).

Photos of the project

Project data at a glance

  • Building: Schierstein Bridge
  • Street: A643
  • Location: Mainz/Wiesbaden
  • Period: 2013
  • Performance: Bridge protection
  • Systems: 4 lanes Weigh in Motion

You can find an overview of all projects in our References.

Are you planning a bridge protection or axle load measurement?

We advise you from the feasibility study to planning and commissioning. Whether buying or renting – contact us.