Height control at the Sechshelden valley bridge (B277)
At the Sechshelden valley bridge on the B277 near Haiger, traffic lines implemented a height control using Height in Motion in 2024 and 2025. Vehicles that are too high are automatically diverted.
The task
Vehicles that are too high can damage a structure, for example by striking the structure with a raised platform. Therefore, every vehicle that is too high should be detected at the Sechshelden valley bridge before it causes damage.
The solution of traffic-lines
Height in Motion was used with automatic derivation.
- Height in Motion measures the height of each vehicle and automatically detects vehicles that are too high.
More about the system: Height in Motion.
Project data at a glance
- Building: Sechshelden Viaduct
- Street: B277
- Location: Haiger
- Period: 2024–2025
- Performance: Height control
- Systems: Height in Motion with automated diversion
You can find an overview of all projects in our References.
Are you planning a bridge protection or axle load measurement?
We advise you from the feasibility study to planning and commissioning. Whether buying or renting – contact us.

